WWII Weapons cost, mostly aircraft. (1/3)
From
Geoffrey Sinclair@21:1/5 to
All on Sat Oct 9 23:38:10 2021
What does an aircraft cost has the answer it depends. The following is a collection of figures and show plenty of variation. Things like whether
spare parts are included, if a company is making more than one product how things like head office costs are allocated, whether depreciation of the building etc. is included.
In April 1938 the British calculated the total cost of ownership of a naval aircraft, that is purchase, running and modernisation cost, as 11,500 pounds per year, which meant it was about 6 aircraft to the destroyer.
Australian Archives MP450/1 109 Detailed break down of Beaufort costs, per aircraft in Australian pounds.
Tooling 1,895, preliminary expenses 532, Improvements and extensions to properties 893 (Railways 554, Holden 186, other contractors 10, stores,
flight field and plants 143), Plant, machinery and equipment 1,136, office furniture 168, which gives a total of 4,623 of establishment costs per aircraft.
Newport Workshop 1,477 (Labor 622, overhead 693, sub contract 162), Chullora Workshop 2,019 (Labor 734, overhead 1,155, sub contract 130), Islington Workshop 1,342 (Labor 516, overhead 745, sub contract 81),
Assembly Workshops Mascot/Fishermans Bend 2,510 (Labor 1,038, overhead
1,472), Holden production cost per aircraft set 2,321, Richards Industries production cost per aircraft set 292, freight 350, central office overhead 3,224, Materials (including sub contractors' costs other than Holden or Richards Industries) Holden 821 (746 plus 75 for ten percent allowance), Richards Industries 44 (40 plus 4 for ten percent allowance), Newport (795
plus 79 for ten percent allowance), Chullora (2,780 plus 278 for ten percent allowance), Islington 1,407 (1,279 plus 128 for ten percent allowance), Assembly (4,446 plus 445 for ten percent allowance). Appendix A equipment including gun turret 2,627 (Which gives the airframe cost as 27,257),
Engines and Propellers (Overseas costs, Wasp engines and Curtiss propellers) 12,546 (Which gives total aircraft cost of 39,803). So 39,803 plus 4,623
gives total costs per completed aircraft as 44,426 pounds. The above
excluding license fees.
Firstly some US data. Ford Willow run used more tooling and so less man
hours but costs about the same, for a variety of reasons including the
frequent design changes.
Aircraft Unit costs, US Archives RG18 E 10 B 68, CF Contractor Furnished,
GFE Government Furnished Equipment
Date / Model / Airframe / Engines(s) / Propeller(s) / GFE / Ordnance / Communications / Total / Notes
28-Feb-43 / B-29 / $362,347 / $101,685 / $10,328 / $125,341 /
$4,836 / $34,738 / $639,275 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / B-32 / $522,613 / $101,685 / $23,310 / $68,947 / $3,247
/ $34,150 / $753,952 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / B-17 / $111,443 / $34,287 / $3,400 / $45,606 / $4,595
/ $9,040 / $208,371 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / B-24 / $115,338 / $32,659 / $4,220 / $49,781 / $3,205
/ $8,474 / $213,677 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / B-25 / $59,358 / $29,131 / $3,071 / $19,805 / $4,147 / $8,337 / $123,849 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / B-26 / $106,677 / $43,171 / $14,110 / $21,647 / $3,547
/ $7,749 / $196,901 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF / $1,250 / $188,257 / Costs based on final production contract
28-Feb-43 / A-20 / $44,366 / $30,795 / $4,428 / $18,364 / $2,345 / $3,813 / $104,111 / Costs based on final production contract
28-Feb-43 / A-26 / $106,807 / $33,466 / $3,700 / $29,277 / $14,067
/ $3,948 / $191,265 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / A-28 / $93,725 / $19,634 / $5,000 / $9,038 / $- /
$250 / $127,647 / Costs based on final production contract
28-Feb-43 / A-29 / $91,688 / $23,000 / $5,000 / $9,038 / $2,093 / $250 / $131,069 / Costs based on final production contract
28-Feb-43 / A-30 / $103,962 / $29,104 / $4,668 / $3,712 / $2,737 / $6,777 / $150,960 / Costs based on final production contract
28-Feb-43 / A-24 / $33,172 / $9,103 / $1,739 / $1,997 / $1,640 / $4,800 / $52,451 / Costs based on final production contract
28-Feb-43 / A-25 / $67,492 / $13,559 / $3,988 / $1,997 / $2,240 / $3,500 / $92,776 / Costs based on final production contract
28-Feb-43 / A-31 / $67,230 / $13,859 / $2,330 / $1,863 / $1,978 / $250 / $87,510 / Costs based on final production contract
28-Feb-43 / A-35 / $36,874 / $13,351 / $2,353 / $3,026 / $2,270 / $3,911 / $61,785 / Costs based on final production contract
28-Feb-43 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
$2,632 / $2,516 / $60,204 / Costs based on final production contract 28-Feb-43 / P-38 / $74,536 / $18,866 / $5,270 / $5,293 / $2,405 / $3,631 / $110,001 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-59 / $157,295 / $75,000 / $- / $2,001 / $4,034 /
$2,864 / $241,194 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-61 / $154,899 / $44,714 / $6,352 / $14,507 / $4,684
/ $19,758 / $244,914 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 / $3,260 / $143,076 / Costs based on final production contract
28-Feb-43 / P-82 / $86,540 / $36,000 / $7,471 / $3,967 / $1,870 / $1,545 / $137,393 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-39 / $24,866 / $12,545 / $3,256 / $2,673 / $4,712 / $2,633 / $50,685 / Costs based on final production contract
28-Feb-43 / P-40 / $26,709 / $7,714 / $2,635 / $2,068 / $2,646 / $2,904 / $44,676 / Costs based on final production contract
28-Feb-43 / P-43 / $54,907 / $12,635 / $4,500 / $5,231 / $2,490 / $3,160 / $82,923 / Costs based on final production contract
28-Feb-43 / P-47 / $47,796 / $22,608 / $5,975 / $5,651 / $2,527 / $3,295 / $87,852 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-51 / $23,583 / $17,558 / $3,740 / $2,649 / $1,905 / $2,780 / $52,215 / Merlin Versions. Costs based on weighted average of uncompleted contracts
28-Feb-43 / P-63 / $28,049 / $13,183 / $3,540 / $3,693 / $4,296 / $2,640 / $55,401 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-66 / $70,503 / $17,509 / CF / CF / No info. /
$3,160 / $91,172 / Costs based on final production contract
28-Feb-43 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 / $3,688 / $134,208 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-80 / $75,913 / $30,000 / $- / $2,944 / $1,897 /
$2,317 / $113,071 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
$1,341 / $3,260 / $162,993 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 / $10,500 / $603,932 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / OA-10 (PBY) / $216,250 / CF / CF / $559 / $- / CF / $216,809 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / OA-11 / $175,000 / CF / CF / CF / $- / $- /
$175,000 / Costs based on final production contract
28-Feb-43 / OA-12 (J2F) / $69,000 / CF / CF / CF / $- / $- / $69,000 / Costs based on final production contract
28-Feb-43 / TO-50 / $48,431 / CF / $250 / $919 / $26 / $1,200 / $50,826 / Costs based on final production contract
28-Feb-43 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
$4,930 / $42,540 / Costs based on final production contract
28-Feb-43 / C-54 / $243,277 / $50,186 / $5,200 / $10,888 / $113 / $7,995 / $317,659 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-69 / $488,477 / $95,643 / $6,360 / $10,788 / $15 / $7,067 / $608,350 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-74 / $949,485 / $220,000 / $12,200 / $19,698 / $15 / $6,761 / $1,208,159 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / C-87 / $161,800 / $35,933 / $9,840 / $21,111 / $484 / $6,935 / $236,103 / Costs based on final production contract
28-Feb-43 / C-45 / $34,963 / $8,917 / $1,892 / $4,027 / No info. / $3,670 / $53,469 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-46 / $174,660 / $28,080 / $9,630 / $8,600 / $13 / $9,277 / $230,260 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-47 / $49,719 / $13,650 / $2,640 / $8,029 / $14 / $14,575 / $88,627 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-48 / $91,000 / $30,000 / $4,594 / $413 / $30 /
$8,460 / $134,497 / Costs based on final production contract
28-Feb-43 / C-49 / $136,997 / CF / CF / $1,844 / $15 / $8,811 / $147,667 / Costs based on final production contract
28-Feb-43 / C-50 / $95,381 / $19,104 / $4,594 / $725 / No info. / $7,849 / $127,653 / Costs based on final production contract
28-Feb-43 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. / $7,849 / $132,181 / Costs based on final production contract
28-Feb-43 / C-52 / $105,973 / $24,780 / $4,594 / $725 / No info. / $7,849 / $143,921 / Costs based on final production contract
28-Feb-43 / C-53 / $142,231 / CF / CF / $1,844 / $15 / $6,380 / $150,470 / Costs based on final production contract
28-Feb-43 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
$361,556 / Costs based on final production contract
28-Feb-43 / C-56 / $108,797 / CF / CF / CF / No info. / No info. /
$108,797 / Costs based on final production contract
28-Feb-43 / C-57 / $112,377 / CF / CF / CF / No info. / No info. /
$112,377 / Costs based on final production contract
28-Feb-43 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
$110,083 / Costs based on final production contract
28-Feb-43 / C-60 / $79,644 / $18,057 / $4,472 / $4,038 / $15 /
$6,942 / $113,168 / Costs based on final production contract
28-Feb-43 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 / $147,815 / Costs based on final production contract
28-Feb-43 / C-76 / $137,125 / $14,690 / $5,950 / $9,280 / $15 / $7,100 / $174,160 / Costs based on final production contract
28-Feb-43 / C-78 / $16,873 / $5,852 / $1,988 / $2,657 / $15 /
$6,348 / $33,733 / Costs based on final production contract
28-Feb-43 / C-82 / $427,244 / $36,000 / $3,880 / $8,592 / $15 / $6,415 / $482,146 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-43 / $18,732 / $5,074 / $1,104 / $1,162 / $- /
$1,260 / $27,332 / Costs based on final production contract
28-Feb-43 / C-61 / $9,464 / $4,093 / CF / $207 / $- / $2,209 / $15,973 / Costs based on final production contract
28-Feb-43 / C-64 / $24,839 / $5,869 / $855 / $2,134 / $10 /
$1,544 / $35,251 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / AT-7 / $41,719 / $14,519 / $2,050 / $8,250 / $- /
$3,671 / $70,209 / Costs based on final production contract
28-Feb-43 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
$1,230 / $41,701 / Costs based on final production contract
28-Feb-43 / AT-9 / $27,603 / $6,947 / $1,700 / $7,042 / $- /
$1,100 / $44,392 / Costs based on final production contract
28-Feb-43 / AT-10 / $29,600 / $7,534 / $1,665 / $5,271 / $- /
$925 / $44,995 / Costs based on final production contract
28-Feb-43 / AT-11 / $36,447 / $14,519 / $1,965 / $8,250 / $650 / $2,636 / $64,467 / Costs based on final production contract
28-Feb-43 / AT-17 / $17,383 / $5,852 / $354 / $2,781 / $- /
$1,100 / $27,470 / Costs based on final production contract
28-Feb-43 / AT-18 / $82,309 / $18,339 / $4,600 / $7,863 / $1,025 / $6,586 / $120,722 / Costs based on final production contract
28-Feb-43 / AT-20 / $44,737 / CF / CF / CF / $- / No info. / $44,737 / Costs based on final production contract
28-Feb-43 / AT-21 / $60,715 / $24,292 / $1,740 / $8,473 / $1,025 / $2,829 / $99,074 / Costs based on final production contract
28-Feb-43 / AT-6 / $11,500 / $5,869 / $853 / $2,409 / $270 /
$1,318 / $22,219 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / AT-16 / $18,594 / $5,880 / $1,068 / $1,874 / $- / CF
/ $27,416 / Costs based on final production contract
28-Feb-43 / AT-19 / $17,736 / $3,470 / $850 / $440 / $- / No
info. / $22,496 / Costs based on final production contract
28-Feb-43 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
$1,385 / $42,337 / Costs based on final production contract
28-Feb-43 / BT-13 / $7,076 / $7,260 / $900 / $2,360 / $- / $1,352
/ $18,948 / Costs based on final production contract
28-Feb-43 / BT-15 / $13,778 / $5,542 / $900 / $2,313 / $- /
$1,356 / $23,889 / Costs based on final production contract
28-Feb-43 / PT-13 / $6,045 / $4,227 / $645 / $1,374 / $- / $- / $12,291 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / PT-17 / $5,530 / $2,350 / $357 / $602 / $- / $97 / $8,936 / Costs based on final production contract
28-Feb-43 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- / $9,819 / Costs based on final production contract
28-Feb-43 / PT-19 / $8,107 / $3,317 / $150 / $429 / $- / $97 / $12,100 / Costs based on final production contract
28-Feb-43 / PT-22 / $8,226 / CF / CF / $247 / $- / $- / $8,473 / Costs based on final production contract
28-Feb-43 / PT-23 / $11,059 / $3,316 / $215 / $755 / $- / $97 / $15,442 / Costs based on final production contract
28-Feb-43 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
/ Costs based on final production contract
28-Feb-43 / PT-26 / $10,285 / $3,187 / $150 / $1,347 / $- / $83
/ $15,052 / Costs based on final production contract
28-Feb-43 / PT-27 / $5,341 / $2,678 / CF / CF / $- / $83 /
$8,102 / Costs based on final production contract
28-Feb-43 / L-1 / $20,368 / $3,860 / $1,125 / $1,191 / $26 /
$1,200 / $27,770 / Costs based on final production contract
28-Feb-43 / L-2 / $2,667 / CF / CF / $84 / $- / $247 / $2,998
/ Costs based on final production contract
28-Feb-43 / L-3 / $2,138 / CF / CF / $11 / $- / $247 / $2,396
/ Costs based on final production contract
28-Feb-43 / L-4 / $2,227 / CF / CF / $152 / $- / $247 / $2,626
/ Costs based on final production contract
28-Feb-43 / L-5 / $6,164 / $1,956 / $352 / $427 / $10 / $263 / $9,172 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / L-6 / $6,054 / CF / CF / $11 / $- / $61 / $6,126 / Total in table minus Comms cost. Costs based on final production contract 28-Feb-43 / R-4 / $39,317 / $3,401 / $- / $667 / $- / $229 / $43,614 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / R-5 / $50,600 / $7,259 / $- / $1,208 / $10 / $1,460
/ $60,537 / Costs based on weighted average of uncompleted contracts 28-Feb-43 / R-6 / $41,222 / $4,663 / $- / $1,153 / $10 / $1,152
/ $48,200 / Costs based on weighted average of uncompleted contracts 30-Nov-44 / B-29 / $434,512 / $101,877 / $13,628 / $124,787 /
$5,531 / $34,738 / $715,073 / Costs based on uncompleted contracts 30-Nov-44 / B-32 / $522,816 / $101,877 / $24,892 / $71,208 / $4,624
/ $34,150 / $759,567 / Costs based on uncompleted contracts
30-Nov-44 / B-17 / $125,464 / $34,875 / $6,487 / $46,413 / $5,686
/ $9,040 / $227,965 / Costs based on uncompleted contracts
30-Nov-44 / B-24 / $114,951 / $34,497 / $8,663 / $48,288 / $4,505
/ $8,474 / $219,378 / Costs based on uncompleted contracts
30-Nov-44 / B-25 / $89,920 / $29,131 / $3,071 / $19,703 / $5,837 / $8,337 / $155,999 / Costs based on uncompleted contracts
30-Nov-44 / B-26 / $110,260 / $43,171 / $14,110 / $21,647 / $5,028
/ $7,749 / $201,965 / Costs based on uncompleted contracts
30-Nov-44 / A-26 / $116,760 / $34,194 / $3,034 / $29,488 / $13,213
/ $3,939 / $200,628 / Costs based on uncompleted contracts
30-Nov-44 / P-38 / $74,673 / $18,867 / $5,270 / $6,199 / $2,901 / $3,631 / $111,541 / Costs based on uncompleted contracts
30-Nov-44 / P-59 / $129,296 / $75,000 / $- / $2,001 / $4,034 /
$2,864 / $213,195 / Costs based on uncompleted contracts
30-Nov-44 / P-61 / $147,960 / $44,729 / $9,720 / $17,611 / $6,245
/ $19,758 / $246,023 / Costs based on uncompleted contracts
30-Nov-44 / P-82 / $86,540 / $36,000 / $9,200 / $3,229 / $444 / $1,545 / $136,958 / Costs based on uncompleted contracts
30-Nov-44 / P-47 / $49,420 / $22,608 / $5,257 / $5,210 / $3,506 / $3,295 / $89,296 / Costs based on uncompleted contracts
30-Nov-44 / P-51 / $25,795 / $17,558 / $2,555 / $2,234 / $2,559 / $2,780 / $53,481 / Costs based on uncompleted contracts
30-Nov-44 / P-63 / $29,194 / $13,183 / $3,282 / $3,373 / $5,140 / $2,638 / $56,810 / Costs based on uncompleted contracts
30-Nov-44 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 / $3,688 / $134,208 / Costs based on uncompleted contracts
30-Nov-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
$3,500 / $120,012 / Costs based on uncompleted contracts
30-Nov-44 / YP-60 / $1,293,710 / $24,868 / $6,881 / $2,722 / $1,784
/ $4,673 / $1,334,638 / Costs based on uncompleted contracts
30-Nov-44 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 / $10,500 / $603,932 / Costs based on uncompleted contracts
30-Nov-44 / OA-10 (PBY) / $216,058 / CF / CF / $559 / $- / CF /
$216,617 / Costs based on uncompleted contracts
30-Nov-44 / C-54 / $256,186 / $58,094 / $6,287 / $9,949 / $15 / $7,637 / $338,168 / Costs based on uncompleted contracts
30-Nov-44 / C-69 / $534,707 / $95,678 / $6,360 / $7,736 / $15 / $7,067 / $651,563 / Costs based on uncompleted contracts
30-Nov-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs based on uncompleted contracts
30-Nov-44 / C-45 / $36,585 / $10,705 / $2,050 / $4,894 / $- /
$3,671 / $57,905 / Costs based on uncompleted contracts
30-Nov-44 / C-46 / $174,696 / $31,748 / $12,244 / $8,785 / $15 / $9,277 / $236,765 / Costs based on uncompleted contracts
30-Nov-44 / C-47 / $53,490 / $13,733 / $3,028 / $7,805 / $15 / $15,220 / $93,291 / Costs based on uncompleted contracts
30-Nov-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 / $6,415 / $477,507 / Costs based on uncompleted contracts
30-Nov-44 / C-64 / $24,839 / $5,933 / $1,055 / $2,056 / $14 /
$1,544 / $35,441 / Costs based on uncompleted contracts
30-Nov-44 / AT-6 / $13,100 / $5,933 / $1,050 / $2,501 / $700 /
$1,318 / $24,602 / Costs based on uncompleted contracts
30-Nov-44 / L-4 / $2,210 / CF / CF / $150 / $- / $247 / $2,607 / Costs based on uncompleted contracts
30-Nov-44 / L-5 / $6,199 / $1,956 / $149 / $445 / $27 / $263 / $9,039 / Costs based on uncompleted contracts
30-Nov-44 / R-4 / $39,152 / $3,401 / $- / $667 / $- / $229 / $43,449 / Costs based on uncompleted contracts
30-Nov-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
/ $60,471 / Costs based on uncompleted contracts
30-Nov-44 / R-6 / $41,145 / $4,663 / $- / $1,019 / $14 / $1,152
/ $47,993 / Costs based on uncompleted contracts
31-Aug-44 / B-29 / $469,269 / $100,406 / $12,433 / $125,863 /
$5,526 / $34,738 / $748,235 / Airframe and engine costs subject to revision. Costs based on uncompleted contracts
31-Aug-44 / B-32 / $522,661 / $100,406 / $20,841 / $66,491 / $4,624
/ $34,150 / $749,173 / Costs based on uncompleted contracts
31-Aug-44 / B-17 / $129,150 / $35,521 / $11,247 / $47,425 / $5,966
/ $9,040 / $238,349 / Costs based on uncompleted contracts
31-Aug-44 / B-24 / $138,585 / $33,363 / $13,004 / $47,956 / $4,520
/ $8,474 / $245,902 / Costs based on uncompleted contracts
31-Aug-44 / B-25 / $94,229 / $29,104 / $5,096 / $15,392 / $10,827
/ $8,337 / $162,985 / Costs based on uncompleted contracts
31-Aug-44 / B-26 / $120,048 / $43,171 / $14,145 / $20,169 / $5,296
/ $7,749 / $210,578 / Costs based on uncompleted contracts
31-Aug-44 / A-20 / $61,510 / $29,945 / $4,388 / $14,155 / $3,204 / $3,813 / $117,015 / Costs based on uncompleted contracts
31-Aug-44 / A-26 / $112,214 / $33,838 / $5,096 / $29,487 / $13,213
/ $3,939 / $197,787 / Costs based on uncompleted contracts
31-Aug-44 / P-38 / $70,168 / $19,344 / $5,386 / $6,383 / $2,914 / $3,631 / $107,826 / Costs based on uncompleted contracts
31-Aug-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
$2,864 / $212,978 / Costs based on uncompleted contracts
31-Aug-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 / $1,545 / $132,358 / Costs based on uncompleted contracts
31-Aug-44 / P-39 / $26,471 / $12,545 / $3,750 / $2,673 / $4,712 / $2,633 / $52,784 / Costs based on uncompleted contracts
31-Aug-44 / P-40 / $26,352 / $10,503 / $3,110 / $2,068 / $2,646 / $2,904 / $47,583 / Costs based on uncompleted contracts
31-Aug-44 / P-47 / $55,783 / $23,852 / $6,960 / $5,357 / $3,506 / $2,948 / $98,406 / Costs based on uncompleted contracts
31-Aug-44 / P-51 / $27,889 / $17,545 / $4,391 / $2,236 / $2,574 / $2,780 / $57,415 / Costs based on uncompleted contracts
31-Aug-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 / $2,836 / $179,512 / Costs based on uncompleted contracts
31-Aug-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 / $3,688 / $135,398 / Costs based on uncompleted contracts
31-Aug-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
$3,500 / $120,012 / Costs based on uncompleted contracts
31-Aug-44 / F-11 / $447,620 / $55,000 / $25,000 / $10,647 / $15 / $10,500 / $548,782 / Costs based on uncompleted contracts
31-Aug-44 / OA-10 (PBY) / $216,250 / CF / CF / CF / $- / CF / $216,250
/ Costs based on uncompleted contracts
31-Aug-44 / C-54 / $250,515 / $59,398 / $8,729 / $9,762 / $15 / $7,918 / $336,337 / Costs based on uncompleted contracts
31-Aug-44 / C-69 / $534,367 / $92,892 / $14,073 / $7,736 / $15 / $7,067 / $656,150 / Costs based on uncompleted contracts
31-Aug-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs based on uncompleted contracts
31-Aug-44 / C-87 / $155,000 / $28,334 / $9,840 / $22,811 / $15 / $6,935 / $222,935 / Costs based on uncompleted contracts
31-Aug-44 / C-45 / $38,764 / $14,519 / $4,100 / $5,292 / $- /
$3,670 / $66,345 / Costs based on uncompleted contracts
31-Aug-44 / C-46 / $189,865 / $31,748 / $13,966 / $9,814 / $15 / $9,277 / $254,685 / Costs based on uncompleted contracts
31-Aug-44 / C-47 / $61,062 / $18,707 / $3,804 / $8,160 / $15 / $14,574 / $106,322 / Costs based on uncompleted contracts
31-Aug-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 / $6,415 / $477,507 / Costs based on uncompleted contracts
31-Aug-44 / UC-61 / $9,394 / $3,187 / $150 / $207 / $- / $2,209
/ $15,147 / Costs based on uncompleted contracts
31-Aug-44 / C-64 / $26,521 / $5,769 / $1,062 / $2,056 / $14 /
$1,544 / $36,966 / Costs based on uncompleted contracts
31-Aug-44 / AT-7 / $41,275 / $10,286 / $2,050 / $8,250 / $- /
$2,299 / $64,160 / Costs based on uncompleted contracts
31-Aug-44 / AT-21 / $62,389 / $24,292 / $1,844 / $8,457 / $1,025 / $2,758 / $100,765 / Costs based on uncompleted contracts
31-Aug-44 / AT-6 / $12,970 / $6,122 / $1,068 / $2,986 / $676 /
$1,318 / $25,140 / Costs based on uncompleted contracts
31-Aug-44 / AT-19 / $17,736 / $3,805 / $905 / $440 / $- / No info.
/ $22,886 / Costs based on uncompleted contracts
31-Aug-44 / L-4 / $2,277 / CF / CF / $150 / $- / $247 / $2,674 / Costs based on uncompleted contracts
31-Aug-44 / L-5 / $6,359 / $1,956 / $149 / $463 / $26 / $263 / $9,216 / Costs based on uncompleted contracts
31-Aug-44 / R-4 / $39,152 / $3,406 / $- / $667 / $- / $229 / $43,454 / Costs based on uncompleted contracts
31-Aug-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
/ $60,471 / Costs based on uncompleted contracts
31-Aug-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
/ $47,990 / Costs based on uncompleted contracts
31-Aug-44 / CG-4A / $21,317 / $- / $- / $1,123 / $- / $155 / $22,595 / 15 place. Costs based on uncompleted contracts
31-Jul-44 / B-29 / $478,180 / $100,406 / $12,181 / $125,919 /
$5,525 / $34,738 / $756,949 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / B-32 / $540,305 / $100,406 / $18,000 / $68,734 / $4,624
/ $34,150 / $766,219 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / B-17 / $157,484 / $37,480 / $11,755 / $48,939 / $5,999
/ $10,305 / $271,962 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / B-24 / $169,452 / $36,539 / $12,899 / $49,034 / $4,726
/ $9,752 / $282,402 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / B-25 / $93,690 / $29,589 / $5,201 / $20,514 / $8,041 / $8,899 / $165,934 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / B-26 / $140,735 / $48,097 / $13,999 / $22,041 / $5,059
/ $12,590 / $242,521 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF /
$1,250 / $188,257 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / A-20 / $75,448 / $26,333 / $5,020 / $9,920 / $3,768 / $3,828 / $124,317 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / A-26 / $112,264 / $33,838 / $5,096 / $29,488 / $13,213
/ $3,939 / $197,838 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / A-28 / $91,499 / $19,634 / $5,000 / $9,038 / $- /
$250 / $125,421 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-29 / $89,262 / $21,653 / $5,000 / $9,038 / $2,093 / $250 / $127,296 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-30 / $110,586 / $28,427 / $4,664 / $3,250 / $2,773 / $3,583 / $153,283 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / A-24 / $35,922 / $8,971 / $1,739 / $2,876 / $1,720 / $5,197 / $56,425 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / A-25 / $67,492 / $14,001 / $3,988 / $6,692 / $2,303 / $3,818 / $98,294 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / A-31 / $65,852 / $17,990 / $2,330 / $1,863 / $1,978 / $250 / $90,263 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-35 / $56,166 / $14,552 / $2,353 / $3,026 / $2,270 / $3,911 / $82,278 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
$2,632 / $2,516 / $60,204 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-38 / $73,607 / $21,096 / $5,822 / $7,748 / $3,531 / $3,873 / $115,677 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
$2,864 / $212,978 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-61 / $191,831 / $49,392 / $11,841 / $18,144 / $6,308
/ $19,918 / $297,434 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 / $3,260 / $143,076 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 / $1,545 / $132,358 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-39 / $32,824 / $13,518 / $4,972 / $2,907 / $5,767 / $4,305 / $64,293 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-40 / $29,515 / $13,905 / $3,266 / $2,325 / $3,237 / $3,720 / $55,968 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-47 / $61,699 / $24,313 / $6,922 / $5,767 / $3,504 / $3,303 / $105,508 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-51 / $28,984 / $17,328 / $4,887 / $2,322 / $2,493 / $2,830 / $58,844 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-63 / $28,551 / $13,944 / $5,238 / $2,984 / $4,969 / $2,636 / $58,322 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 / $2,836 / $179,512 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 / $3,688 / $135,398 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
$1,341 / $3,260 / $162,993 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
$4,930 / $42,540 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / OA-10 (PBY) / $158,941 / $25,269 / in GFE / $24,975 /
$3,174 / $10,440 / $222,799 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / C-54 / $262,501 / $59,639 / $9,468 / $9,804 / $15 / $7,824 / $349,251 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / C-69 / $534,331 / $92,892 / $15,120 / $7,736 / $15 / $7,067 / $657,161 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / C-87 / $196,474 / $31,517 / $9,840 / $22,099 / $211 / $6,935 / $267,076 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / C-46 / $197,639 / $33,772 / $13,821 / $9,981 / $15 / $9,315 / $264,543 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / C-47 / $73,749 / $17,428 / $4,616 / $5,707 / $16 /
[continued in next message]
--- SoupGate-Win32 v1.05
* Origin: fsxNet Usenet Gateway (21:1/5)