On Saturday, April 18, 2009 at 3:27:23 PM UTC+5:30,
[email protected] wrote:
(In MSSQL, one can simply do "restore logs from .... with standby ..."
to make the primary which is online to switch to standby mode.)
Regards,
Ranjit
Any possibility of doing this? In MSSQL you can dump a trans log at
primary, then LOAD the same trans log at same primary to make it the
standby. Possibly the same will work for Sybase?
Hi
Any one has solution for this. Any possibility of doing Switchover and Switchback without doing fullback and restore.
--- SoupGate-Win32 v1.05
* Origin: fsxNet Usenet Gateway (21:1/5)